Servery extension — wall removal, new extended dual-sided servery unit designed and installed to increase service capacity and eliminate peak-time queuing for students. Completed during summer 2025, ready for the new academic term.
As student numbers at Nottingham College's Science Park campus continued to grow, the catering management team identified a clear operational problem: the existing servery could only be operated from one side of the counter, creating unacceptable queuing times at peak lunchtime periods.
Castle Catering Engineers were engaged to assess the existing layout and propose a solution. Our recommendation was to remove the adjacent wall and extend the full servery run — enabling simultaneous dual-sided service from both sides of the counter.
The new extended servery was designed with black gloss fascia, stainless steel top and upstands, integrated hot wells and glass sneeze guard canopy. All works were completed during the summer school holidays, with the extended servery fully operational ready for the new academic term.
| Client | Nottingham College — Science Park campus |
| Location | Nottingham |
| Completed | Summer 2025 |
| Scope | Servery extension — wall removal, new unit design and installation |
| Key outcome | Dual-sided service, reduced student queuing |
| Timing | Completed during summer holidays — zero disruption to term |
| DBS Enhanced | All engineers DBS Enhanced approved |