Complete commercial kitchen design and installation — main kitchen, marble servery pass, walk-in chiller room, glasswash room and ice machine room — incorporating flood-resilience measures throughout. On time and on budget.
Following serious flooding in October 2023, The Hurts Arms in Ambergate, Derbyshire undertook a comprehensive refurbishment of the entire ground floor. Castle Catering Engineers were invited to advise, redesign and deliver all commercial kitchen areas — adapting the existing design to fully meet the owners' operational requirements and the flood-resilience demands of the rebuild.
The scope covered five distinct areas: a high-performance main kitchen, a bespoke marble servery pass to the restaurant, a walk-in chiller room, a dedicated glasswash and dishwash room, and an ice machine room — all designed to work seamlessly together under busy service conditions.
Our installation team worked alongside the main contractor throughout to ensure all flood-protection measures were integrated into every kitchen zone. The project was completed in April 2025, on time and within budget. All gas installations were carried out by Gas Safe registered engineers (Licence 597490), with full CP42 certificates issued on completion.
| Client | The Hurts Arms, Ambergate |
| Location | Ambergate, Derbyshire |
| Completed | April 2025 |
| Scope | Design, supply & full installation |
| Gas Safe | Licence 597490 |
| Brands | Rational, Blue Seal, Maidaid, Lincat, Italforni |
| Special features | Flood-resilience integration, marble servery pass, walk-in chiller |
| Certification | CP42 issued on completion |








The Hurts Arms in Ambergate suffered serious flooding in October 2023. As part of a comprehensive ground floor refurbishment, Castle Catering Engineers were invited to redesign and deliver all commercial kitchen areas — adapting an existing design to fully meet the owners' operational requirements and the flood-resilience demands of the rebuild.
Our design team worked alongside the main contractor throughout to ensure flood-protection measures were integrated into every kitchen zone — from floor levels and drainage to equipment positioning. The kitchen was designed to meet both operational efficiency and structural resilience requirements.
Yes. All gas works were carried out by Gas Safe registered engineers (Licence 597490). Full CP42 Commercial Gas Safety Certificates were issued on completion of all gas installations.
Gas Safe (Licence 597490), CSCS members, DBS Enhanced approved. Free site survey across Nottinghamshire, Derbyshire and the wider East Midlands.