On the Road 7 Days a WeekGas Safe Reg.597490 • CSCS Members • DBS Enhanced • Est.2017
📞 0115 905 1208
Home/Projects

Commercial Kitchen
Projects

Design, installation and fabrication projects across Nottingham and the East Midlands. Free site survey, CAD design, in-house fabrication and full installation by Gas Safe registered engineers.

Gas Safe 597490
CSCS Members
DBS Enhanced Approved
Free Site Survey
CAD Design
In-House Fabrication
Full Installation
East Midlands Based
Our Work

Commercial Kitchen Projects Across the East Midlands

Castle Catering Engineers delivers complete commercial kitchen projects — from initial design and equipment specification through to installation, fabrication and full commissioning. Gas Safe registered (Licence 597490), CSCS members, DBS Enhanced approved.

📐
Kitchen Design
CAD layout design, equipment specification and project planning for new and refurbished commercial kitchens.
  • Free site survey
  • CAD layout drawings
  • Equipment specification
View kitchen design →
🏗️
Kitchen Installation
Complete kitchen installation projects — gas, electrical, plumbing, drainage, equipment and fabrication.
  • Full project management
  • Gas Safe installation
  • All trades coordinated
View kitchen projects →
🔩
Kitchen Fabrication
Bespoke stainless steel fabrication manufactured at our Nottingham facility — worktops, sinks, canopies.
  • 304-grade steel standard
  • Any dimensions
  • Supply or supply and fit
View fabrication →
Featured Project
FTSE 100 Client

Games Workshop — Nottingham Headquarters

Games Workshop Nottingham — fully electric kitchen installed by Castle Catering Engineers
Completed May 2025 FTSE 100

Games Workshop
Fully Electric Kitchen

One of Nottingham's biggest employers — FTSE 100

Complete commercial kitchen project — full strip-out to commissioning. A fully electric kitchen specified with Rational, Blue Seal, Maidaid and Blizzard equipment throughout.

  • Full strip-out and new-build fully electric kitchen
  • Rational iCombi Pro, Combi Classic & iVario Pro
  • Blue Seal Turbofan ovens and Nordisk synergy grill
  • Maidaid conveyor dishwasher
  • Blizzard refrigerated prep counters throughout
  • New walk-in cold rooms — designed, built and commissioned
FTSE 100 ClientFully ElectricRational iCombi ProiVario ProBlue SealMaidaid ConveyorBlizzard Refrigeration
View full project → Strip-out to commissioning
Featured Project

The Hurts Arms, Ambergate

The Hurts Arms Ambergate — marble servery pass and kitchen by Castle Catering Engineers
Completed April 2025 Ambergate, Derbyshire

The Hurts Arms
Kitchen Refurbishment

Following serious flooding in October 2023, CCE were invited to redesign and deliver all commercial kitchen areas at this well-known Derbyshire pub — adapting the existing design to incorporate flood-resilience measures throughout.

  • Main kitchen — Italforni, Blue Seal, Lincat cooking suite
  • Bespoke marble servery pass with copper heat lamps
  • Custom walk-in chiller room design and installation
  • Dedicated glasswash room — twin Maidaid glasswashers
  • Ice machine room — full services provision
RationalBlue SealMaidaidLincatItalforniBespoke Fabrication
View full project →
Gas Safe 597490 • On time • On budget

Project

East Midlands Conference Centre, Nottingham

Completed August 2022 Nottingham University Campus

East Midlands Conference Centre
Kitchen Refurbishment

Full extraction canopy system replacement at one of the East Midlands' leading conference venues — on the University of Nottingham campus. Working alongside J. Tomlinsons and Arrow Ceilings.

  • New 6-metre stainless steel island extraction canopy
  • Full risers and service spine
  • MUB630 box fan and ductwork replacement
  • Gas interlocking system with CO/CO₂ monitoring
  • New pipework, electrics, waste and water throughout
  • New suspended kitchen ceiling
6m Island CanopyMUB630 FanGas InterlockGas Safe 597490CO/CO₂J. Tomlinsons
View full project → CP42 Certified • Multi-contractor
East Midlands Conference Centre kitchen canopy installation by Castle Catering Engineers
Project
Further Education

Nottingham College — Science Park Campus

Completed Summer 2025 Further Education

Nottingham College
Servery Extension

Wall removal and new extended dual-sided servery unit — designed and installed to increase throughput at peak lunchtime periods. Completed during summer 2025, ready for the new academic term.

  • Assessment of existing layout and operational constraints
  • Existing wall removed to extend the servery footprint
  • New dual-sided servery unit designed and installed
  • Black gloss fascia, stainless steel top, hot wells and glass sneeze guard
  • Service capacity effectively doubled at peak lunchtime periods
  • Completed during summer holidays — ready for new academic term
FE CollegeServery ExtensionDual-Sided ServiceDBS EnhancedSummer 2025Holiday Programme
View full project → DBS Enhanced • Zero disruption
Nottingham College Science Park — new extended servery installed by Castle Catering Engineers
Project
Academy School

The Waltons Academy, Grantham

Waltons Academy Grantham kitchen installation by Castle Catering Engineers
Education Sector Academy School

The Waltons Academy
Kitchen and Servery Redesign

Grantham, Lincolnshire -- Appointed via GNAS Facilities Management

Complete redesign and installation of the school kitchen and servery to maximise space, increase food production and introduce a new heavy-duty servery counter to serve growing pupil numbers.

  • Complete kitchen and servery redesign, appointed via GNAS facilities management
  • New central cooking area for gas and electric equipment
  • Mechanical extraction with gas interlock and mechanical air-in
  • New heavy-duty servery counter with Ceran worktops and heated gantries
  • Refrigerated and heated grab-and-go units to speed up service
  • Rational, Hobart and Blue Seal -- full installation, commissioning and training
Academy SchoolGranthamDBS EnhancedGas Safe 597490Rational, Hobart, Blue SealGNAS FM
View full project → DBS Enhanced • On time and on budget
Project

Atrium Kitchen Refurbishment

Atrium Kitchen completed installation by Castle Catering Engineers
Completed December 2025 Fully Electric

Atrium Kitchen
Full Refurbishment

A complete transformation -- outdated commercial kitchen stripped back and rebuilt as a fully electric, high-performance culinary space with Rational 20-grid iCombi Pro at its heart.

  • Full strip-out and new hygienic cladding throughout
  • Optimised prep stations with integrated salad counters
  • Upgraded walk-in cold room racking for maximum storage
  • Split warewash zone -- dedicated dishwash and dump station
  • New stainless steel hot cupboard servery with overhead gantry
  • Rational 20-grid iCombi Pro combination oven -- fully commissioned
Fully ElectricDecember 2025Rational 20-GridStrip-Out and RefitSplit WarewashHygienic Cladding
View full project → Strip-out to commissioning
Project
Academy School

Heanor Gate Spencer Academy, Heanor

Heanor Gate Spencer Academy kitchen installation by Castle Catering Engineers
Completed November 2025 Academy School

Heanor Gate Spencer Academy
Kitchen Layout Redesign

Heanor, Derbyshire -- DBS Enhanced Approved

Existing kitchen layout rethought and optimised, retaining and integrating the school's existing equipment alongside new additions to create a fully functional workspace at minimum cost.

  • Full kitchen layout redesign -- existing equipment retained to minimise costs
  • New dishwash area with hood dishwasher, sinks and GreasePak unit
  • New stainless steel prep benches with under-counter storage
  • Moffat hot bain marie servery counter installed
  • Williams refrigeration and Lincat equipment added
  • Delivered on time in coordination with school and construction team
Academy SchoolHeanor DerbyshireDBS EnhancedGas Safe 597490November 2025Moffat, Williams, Lincat
View full project → DBS Enhanced • On time
Recent Installations

More of Our Work Across the East Midlands

A selection of recent canopy installations, Rational oven supply and commissioning, extraction systems and kitchen projects across Nottinghamshire and the East Midlands.

Colwick Hall, Nottingham — Rational iCombi Pro 20-grid combination oven installed by Castle Catering Engineers
Colwick Hall, Nottingham — New Rational iCombi Pro installation
Commercial kitchen canopy installation — CCE bespoke stainless steel extraction canopy being fitted
Commercial kitchen canopy installation — CCE bespoke stainless steel extraction canopy being fitted
Rooftop extraction fan and ductwork installation by Castle Catering Engineers
Rooftop extraction fan and ductwork installation by Castle Catering Engineers
Rational iCombi Pro combination ovens installed and in operation — CCE installation
Rational iCombi Pro combination ovens installed and in operation — CCE installation
Rational iCombi Classic combination ovens installed by Castle Catering Engineers
Rational iCombi Classic combination ovens installed by Castle Catering Engineers
Rational iCombi Pro ovens delivered on site — ready for CCE installation
Rational iCombi Pro ovens delivered on site — ready for CCE installation
Twin Rational iCombi Pro 20-grid combination ovens installed by Castle Catering Engineers
Twin Rational iCombi Pro 20-grid combination ovens installed by Castle Catering Engineers
Rational iCombi Pro stacked combination ovens in completed kitchen — CCE installation
Rational iCombi Pro stacked combination ovens in completed kitchen — CCE installation
New CCE bespoke stainless steel island extraction canopy installed in a new build kitchen
New CCE bespoke stainless steel island extraction canopy installed in a new build kitchen
Have a project in mind?

We deliver commercial kitchen canopy installations, Rational oven supply and commissioning, extraction systems and complete kitchen projects across the East Midlands. Gas Safe registered, CSCS members, DBS Enhanced approved.

📞
Phone
📍
Address
Unit 8 Pottery Court, Pottery Way, Bulwell, Nottingham, NG6 8YN
🕐
Hours
Mon–Fri 07:00–17:00 • Sat–Sun On-Call 08:00–17:00 • Emergency Out of Hours: Leave a Voicemail
Send an Enquiry
We aim to respond within 24–48 hours.

Sent directly to info@ccecatering.com • Your details are kept confidential

Enquiry sent — thank you! We aim to respond within 24–48 hours. Urgent? Call 0115 905 1208.
Something went wrong. Email info@ccecatering.com or call 0115 905 1208.

Ready to Start Your Kitchen Project?

Free site survey. Gas Safe (Licence 597490), CSCS members, DBS Enhanced approved. In-house fabrication, full installation.

Gas Safe 597490Free Site SurveyCSCS MembersDBS EnhancedIn-House Fabrication

We’d like to use analytics cookies to understand how visitors use this site so we can improve it. These are only set if you accept. Declining will not affect how the site works.