On the Road 7 Days a WeekGas Safe Reg.597490 • CSCS Members • DBS Enhanced • Est.2017
📞 0115 905 1208
Home/Projects/Waltons Academy
Education Sector Academy School Grantham, Lincolnshire Gas Safe 597490 DBS Enhanced

The WaltonsAcademyGrantham, Lincolnshire

Complete kitchen and servery redesign incorporating a new central cooking area, mechanical extraction with gas interlock, bespoke stainless steel fabrication, and a new heavy-duty servery counter with Ceran worktops, heated gantries and grab-and-go units. Appointed via GNAS facilities management. Completed on time and on budget.

3+
Major brands: Rational, Hobart, Blue Seal
On time and on budget
DBS
DBS Enhanced approved engineers
CP42
Gas Safe certified on completion
Education Sector - DBS Enhanced
Kitchen and Servery Redesign
New Central Cooking Area
Mechanical Extraction and Gas Interlock
Gas Safe Licence 597490
Rational, Hobart, Blue Seal
Bespoke Stainless Steel Fabrication
GNAS Facilities Management
On Time and On Budget
The Project

A School Kitchen Built to Serve More

The Waltons Academy, Grantham, forms part of a diverse academy group served by their facilities management partners GNAS. Castle Catering Engineers were appointed through competitive tender to redesign and update the school's existing catering facilities, encompassing the main kitchen and servery area, with the objective of creating a more efficient, workable environment for kitchen staff and increasing food production capacity to meet growing pupil numbers.

A new central cooking area was introduced as the heart of the kitchen redesign, housing the gas and electric cooking equipment in a logical, ergonomic configuration that maximises workflow for the catering team. A new efficient mechanical extraction system was designed and installed incorporating a gas interlocking system and mechanical air-in to meet current ventilation regulations and BS6173 compliance requirements. All gas works were carried out by Gas Safe registered engineers (Licence 597490) with CP42 certification issued on completion.

Works also included an enlarged dishwash area, new bespoke stainless steel sinks and preparation benches, and a new heavy-duty main servery counter designed specifically to serve the academy's increasing daily pupil numbers efficiently. The servery was specified with built-in Ceran worktops, heated gantries, hot cupboards, and refrigerated and heated grab-and-go units to accelerate service throughput during peak periods.

Equipment from Rational, Hobart and Blue Seal was supplied and installed. CCE's in-house team of engineers managed the full installation, commissioning and staff training, completing the project on time and on budget.

Project Overview
ClientThe Waltons Academy, Grantham
LocationGrantham, Lincolnshire
Appointed byGNAS Facilities Management
ScopeComplete kitchen and servery redesign and installation
Gas SafeLicence 597490
Key worksNew central cooking area, extraction, gas interlock, bespoke SS fabrication, servery counter
EquipmentRational, Hobart, Blue Seal
ServeryCeran worktops, heated gantries, hot cupboards, grab-and-go units
DeliveryOn time and on budget
CertificationCP42 issued on completion
Accreditations
🔥
Gas Safe
Licence 597490
🏗
CSCS
Members
DBS
Enhanced
Photo Gallery

Project Photography

Waltons Academy Grantham — new kitchen installation showing central cooking suite and extraction canopy
Waltons Academy Grantham — new kitchen installation showing central cooking suite and extraction canopy
Waltons Academy Grantham — new kitchen installation showing central cooking suite and extraction canopy
Waltons Academy Grantham — new kitchen installation showing central cooking suite and extraction canopy
Waltons Academy Grantham — completed kitchen and servery area ready for school catering service
Waltons Academy Grantham — completed kitchen and servery area ready for school catering service
Waltons Academy — new commercial kitchen with bespoke stainless steel fabrication and equipment
Waltons Academy — new commercial kitchen with bespoke stainless steel fabrication and equipment
Waltons Academy — new servery counter with Ceran worktops, heated gantries and grab-and-go units
Waltons Academy — new servery counter with Ceran worktops, heated gantries and grab-and-go units
Scope of Works

What We Delivered

🍲
New Central Cooking Area
A new central cooking configuration housing gas and electric equipment in an ergonomic layout, maximising chef workflow and food production capacity throughout the school day.
💨
Mechanical Extraction and Air-In
New mechanical extraction system with gas interlocking system and mechanical air-in, fully compliant with BS6173 ventilation requirements. CP42 issued on completion.
🔥
Gas Interlocking System
Gas interlocking system designed, installed and commissioned by Gas Safe registered engineers (Licence 597490), linking the gas supply to the ventilation system as required in all commercial kitchens.
🔋
Enlarged Dishwash Area
Dishwash area enlarged to meet the throughput demands of a growing pupil roll, designed for efficient workflow and HACCP compliance.
Bespoke SS Fabrication
Bespoke stainless steel sinks and preparation benches designed and manufactured in-house by CCE, tailored to the exact dimensions and workflow requirements of the redesigned kitchen.
🍽
New Main Servery Counter
Heavy-duty servery counter designed to serve increasing pupil numbers, featuring built-in Ceran worktops, heated gantries, hot cupboards, and refrigerated and heated grab-and-go units to maximise service speed.
🍳
Equipment Supply
Rational, Hobart and Blue Seal equipment supplied and installed, selected for reliability and performance in a high-throughput school catering environment.
📋
Installation and Training
Full installation, commissioning and staff training by CCE in-house engineers, ensuring all kitchen and servery equipment was operational and staff fully trained on handover.
On Time and On Budget
Delivered on programme and within budget with DBS Enhanced approved engineers throughout, causing minimum disruption to the academy.
FAQs

About This Project

Castle Catering Engineers were appointed through competitive tender by GNAS, the facilities management partner for the academy group. This is a common route to CCE for academy trust and education sector kitchen projects across the East Midlands and Lincolnshire.

Complete kitchen and servery redesign: new central cooking area, mechanical extraction with gas interlock and mechanical air-in, enlarged dishwash area, bespoke stainless steel sinks and benches, and a new heavy-duty servery counter with Ceran worktops, heated gantries, hot cupboards and grab-and-go units. Rational, Hobart and Blue Seal equipment throughout.

Yes. CCE in-house engineers managed the full installation, commissioning and staff training across all new equipment, ensuring the kitchen team were confident and fully operational before handover.

Yes. CCE regularly works with academy trusts, MATs and facilities management partners across Nottinghamshire, Lincolnshire and the wider East Midlands. Contact us to discuss your education catering project.

Academy or School Kitchen Project?

Appointed by GNAS on behalf of The Waltons Academy. DBS Enhanced approved, Gas Safe (Licence 597490), CSCS members. Free site survey across the East Midlands and Lincolnshire.

DBS Enhanced ApprovedGas Safe RegisteredCSCS MembersEducation SpecialistsFM Partner ExperienceFree Site Survey
More Projects

See More of Our Work

🏫
Nottingham College
Servery extension, Science Park campus. Dual-sided service. Summer 2025.
View →
Games Workshop
Fully electric kitchen, FTSE 100 client, Nottingham. May 2025.
View →
🍽
The Hurts Arms
Full kitchen design and installation, Ambergate, Derbyshire. April 2025.
View →

We’d like to use analytics cookies to understand how visitors use this site so we can improve it. These are only set if you accept. Declining will not affect how the site works.