A full rethink of the existing kitchen layout, optimising every square metre while retaining and integrating the school's current equipment to keep costs low. New additions were engineered to work seamlessly alongside existing assets, delivering a fully optimised workspace tailored to daily operational needs. Completed November 2025 in close collaboration with the school, construction teams and onsite electricians.
When Heanor Gate Spencer Academy in Heanor, Derbyshire approached Castle Catering Engineers, the brief was clear: rethink the existing kitchen layout to unlock its full potential, while retaining as much of the school's existing equipment as possible to keep the project cost-effective. The challenge was to engineer a highly functional new blueprint that made the most of every square metre of available space.
CCE's design team assessed the existing layout and developed a revised configuration that seamlessly integrated all current assets alongside carefully selected new additions. The result is a fully optimised workspace designed around the daily operational needs of the school's catering team, with new dishwash facilities, upgraded prep benches with under-counter storage, a new hot servery counter and improved refrigeration all working alongside the retained existing equipment.
The project was delivered in close alignment with the school, onsite construction teams and electricians throughout, with CCE coordinating all kitchen trade elements to ensure the works were completed on time and without disruption to the academy's day-to-day operations.
All engineers attending site held DBS Enhanced clearance and CSCS cards as standard, and all gas works were carried out by Gas Safe registered engineers (Licence 597490).
| Client | Heanor Gate Spencer Academy |
| Location | Heanor, Derbyshire |
| Completed | November 2025 |
| Scope | Kitchen layout redesign -- existing equipment retained and integrated with new additions |
| Approach | Existing assets retained to minimise cost, new elements added to optimise workspace |
| Gas Safe | Licence 597490 |
| Key equipment | Moffat hot servery, Williams refrigeration, Lincat water boiler and combination oven |
| Coordination | School management, construction teams and onsite electricians |
| DBS Enhanced | All engineers approved -- education site standard |




CCE rethought the existing kitchen layout, optimising the full space while retaining the school's current equipment to keep costs low. New additions including a dishwash area, prep benches, Moffat hot servery counter, Williams refrigeration and Lincat equipment were integrated alongside existing assets. Completed November 2025.
By assessing the school's existing equipment and retaining everything that could be incorporated into the redesigned layout, CCE avoided unnecessary equipment replacement costs. Only the additions needed to complete and optimise the workspace were specified and installed.
Yes. CCE worked in close alignment with the school, onsite construction teams and electricians throughout the project, coordinating all kitchen trade elements to deliver the complete works on time and without disruption to the academy.
Yes. All CCE engineers hold DBS Enhanced clearance and CSCS cards as standard for all education projects. All gas works are carried out by Gas Safe registered engineers (Licence 597490). No additional vetting required.
DBS Enhanced approved, Gas Safe (Licence 597490), CSCS members. Free site survey across Derbyshire and the East Midlands. Kitchen redesign, new equipment supply and full installation.