Completed April 2025 Pub & Restaurant Kitchen Ambergate, Derbyshire Gas Safe 597490

The Hurts ArmsAmbergate

Complete commercial kitchen design and installation — main kitchen, marble servery pass, walk-in chiller room, glasswash room and ice machine room — incorporating flood-resilience measures throughout. On time and on budget.

5+
Kitchen zones designed and installed
5
Major equipment brands supplied
1
Custom marble servery pass fabricated
On time and on budget
Kitchen Design & Specification
Flood-Resilience Integration
Bespoke Marble Servery Pass
Walk-In Chiller Room
Gas Safe 597490
CSCS Members
DBS Enhanced Approved

Following serious flooding in October 2023, The Hurts Arms in Ambergate, Derbyshire undertook a comprehensive refurbishment of the entire ground floor. Castle Catering Engineers were invited to advise, redesign and deliver all commercial kitchen areas — adapting the existing design to fully meet the owners' operational requirements and the flood-resilience demands of the rebuild.

The scope covered five distinct areas: a high-performance main kitchen, a bespoke marble servery pass to the restaurant, a walk-in chiller room, a dedicated glasswash and dishwash room, and an ice machine room — all designed to work seamlessly together under busy service conditions.

Our installation team worked alongside the main contractor throughout to ensure all flood-protection measures were integrated into every kitchen zone. The project was completed in April 2025, on time and within budget. All gas installations were carried out by Gas Safe registered engineers (Licence 597490), with full CP42 certificates issued on completion.

Project Overview
ClientThe Hurts Arms, Ambergate
LocationAmbergate, Derbyshire
CompletedApril 2025
ScopeDesign, supply & full installation
Gas SafeLicence 597490
BrandsRational, Blue Seal, Maidaid, Lincat, Italforni
Special featuresFlood-resilience integration, marble servery pass, walk-in chiller
CertificationCP42 issued on completion
Accreditations on this project
🔥
Gas Safe
Licence 597490
🏗
CSCS
Members
DBS
Enhanced
Photo Gallery

Project Photography

Walk-in chiller room mid-installation — Storers cold room and stainless shelving
Walk-in chiller room mid-installation — Storers cold room and stainless shelving
Kitchen — Lincat induction suite, refrigerated prep drawers and marble pass beyond
Kitchen — Lincat induction suite, refrigerated prep drawers and marble pass beyond
Main kitchen — cooking suite with Italforni pizza oven, gas range and CCE extraction canopy
Main kitchen — cooking suite with Italforni pizza oven, gas range and CCE extraction canopy
Restaurant pass — marble servery with copper pendant heat lamps and kitchen view
Restaurant pass — marble servery with copper pendant heat lamps and kitchen view
Main kitchen — Blue Seal cooking suite, charbroiler, fryer station and extraction canopy
Main kitchen — Blue Seal cooking suite, charbroiler, fryer station and extraction canopy
Walk-in chiller room completed — Storers insulated cold room with temperature controller
Walk-in chiller room completed — Storers insulated cold room with temperature controller
Glasswash room — Maidaid hood dishwasher, double prep sink and extraction canopy
Glasswash room — Maidaid hood dishwasher, double prep sink and extraction canopy
Glasswash room installation — twin Maidaid undercounter glasswashers being fitted
Glasswash room installation — twin Maidaid undercounter glasswashers being fitted
Scope of Works

What We Delivered

🍽
Main Kitchen
High-performance cooking suite — Italforni pizza oven, Blue Seal gas range, charbroiler and fryer station. Bespoke stainless steel canopy with gas interlocking. Refrigerated prep counters. CP42 certified.
🍽
Marble Servery Pass
Bespoke marble servery pass to the restaurant — designed to specification. Copper heat lamp station. Integrated with kitchen workflow.
Walk-In Chiller Room
Custom walk-in chiller room — insulated panels, chiller unit, digital temperature monitoring, internal stainless racking. Flood-resilience integrated.
🔋
Glasswash & Dishwash Room
Dedicated glasswash room — Maidaid hood dishwasher, double sink, full plumbing and drainage. Separate from main kitchen for HACCP compliance.
🧉
Ice Machine Room
Dedicated ice machine room — water, drainage, ventilation and electrics provision.
🛡
Flood-Resilience Integration
All kitchen zones designed with flood-protection measures integrated throughout — working alongside main contractor to deliver both operational and structural resilience requirements.
FAQs

About This Project

The Hurts Arms in Ambergate suffered serious flooding in October 2023. As part of a comprehensive ground floor refurbishment, Castle Catering Engineers were invited to redesign and deliver all commercial kitchen areas — adapting an existing design to fully meet the owners' operational requirements and the flood-resilience demands of the rebuild.

Our design team worked alongside the main contractor throughout to ensure flood-protection measures were integrated into every kitchen zone — from floor levels and drainage to equipment positioning. The kitchen was designed to meet both operational efficiency and structural resilience requirements.

Yes. All gas works were carried out by Gas Safe registered engineers (Licence 597490). Full CP42 Commercial Gas Safety Certificates were issued on completion of all gas installations.

Planning a Commercial Kitchen Project?

Gas Safe (Licence 597490), CSCS members, DBS Enhanced approved. Free site survey across Nottinghamshire, Derbyshire and the wider East Midlands.

Gas Safe 597490Free Site SurveyCSCS MembersDBS EnhancedIn-House FabricationCP42 Certified
More Projects

See More of Our Work

Games Workshop
Fully electric kitchen — FTSE 100 client, Nottingham. May 2025.
View →
💨
EMCC Nottingham
6-metre island extraction canopy refurbishment — Nottingham University campus.
View →
🏫
Nottingham College
Servery extension — Science Park campus. Dual-sided service. Summer 2025.
View →

We’d like to use analytics cookies to understand how visitors use this site so we can improve it. These are only set if you accept. Declining will not affect how the site works.